Change order when adding blocks to backpack


#1

Hi,
this is just a very simple thing, but it would be useful to change the order when adding blocks to backpack, i.e. the last added blocks should be at the first position of the backpack list. Why? Because it’s very likely that those blocks will be picked from the backpack soon and it avoids the need to scroll down the backpack list.
Thanks